Corrib Gas Field

Project Background

Location: Ireland

Value: €20 million

The project consists of the construction of a new gas receiving and processing terminal to accept gas from the offshore Corrib Gas Field for Shell.

BHL Role
BHL were appointed by PMG to provide professional quantity surveying services for two of the main construction packages – Structural Steel and the Building Packages.
Cost Engineering
Full post contract QS services
Preparation of valuations and cost reports
Agreement of variations and the preparation of the Final Account.

Back to case studies